This phase manages that and includes writing the code of the SAP modules. The information from the legacy system needs to be transferred. Data Migration is required once the system is set up. This phase manages the change in how things are done (the SOP - Standard Operating Procedures), maps out the super (first) users, and conducts training to diminish the objections. Change Management is needed for each new system that involves changes, which many users are naturally opposed to. The infrastructure phase is when the required hardware is purchased in this phase and sets up the environments for testing and production.Īll of the security measures all also configured and installed as part of this phase. Testing all of the specifications which were mapped out in the previous phase are tested in this one, as well as the connectivity to the legacy systems. Planning Your Project using Agile Project Plan in Excel Step 1: Identify all the Project Sprints Step 2: Identify all the Project Tasks of each Sprint Step 3. In the Design and Build phase, all of the specifications of the new system are mapped out and written out on storyboards, and the design of the system is completed. The impact analysis phase maps out the requirements of the new system, who will be using it, and what their required permissions are and is aimed at resolving any issues that may come up with the transition to the new system. Take your plans from zero to 60 in no time flat with project plan templates that are integrated with industry-leading project and portfolio management.